Day 20 Monday - Two Interesting Branch Lines and a different way to get back to Yverdon les Bains.
This was the surprise of the day - a three unit tram train replacing an old single unit on the line to Orbe We took a train from Yverdon les Bains to Chavornay to find that the switching that we used to see doesn't seem to happen there certainly early in the morning. There is a short branch line from here to Orbe which is electrified at 750 V DC, the only such standard gauge line in the country. There is quite a bit of industrial switching required and the plan is to convert the line to the standard Swiss system at 15,000V AC. However the passenger trains, essentially two single units, were becoming life expired and so two two tram trains have been acquired from Karlsruhe as they can operate on both systems. We waited to see the arrival of one of these trains from Orbe and were surprised to see that they are three unit trains. Quite a jump from the earlier equipment. These tram trains started operating here last month. We went up to Orbe and noted that there were none of the...